Beverage Bottling Line Upgrade
Beverages Maharashtra, India 2022

Beverage Bottling Line Upgrade

Retrofit and modernisation of an existing bottling line with new automation controls and vision inspection.

62% → 84%

OEE Improvement

+10 years

Equipment Life Extension

-55%

Unplanned Downtime

30% saving

Project Cost vs Replacement

The Challenge

What the client needed

Replacing a 15-year-old bottling line outright was cost-prohibitive. The client needed a retrofit strategy that would modernise controls, add vision inspection, and deliver measurable OEE improvement — all without a full production shutdown.

Our Solution

How Smachinato delivered

Smachinato executed a phased retrofit replacing legacy relay logic with modern PLC controls, developing new HMI screens, and integrating an inline vision system for fill-level, cap and label inspection. OEE monitoring dashboards were added to give management real-time production visibility.

Deliverables

Scope of work

  • Full PLC retrofit replacing legacy relay logic
  • New HMI development with operator-friendly screens
  • Inline vision inspection for fill, cap and label
  • OEE monitoring dashboard with shift reporting
  • Phased installation plan with zero full-line shutdown

Project Outcome

Extended equipment life by 10 years and improved OEE from 62% to 84%.

Project Details

Client

Regional Beverage Manufacturer

Industry

Beverages

Location

Maharashtra, India

Year

2022

Timeline

5 months (phased retrofit)

Technologies Used

RetrofitPLC UpgradeVision InspectionHMI DevelopmentOEE Monitoring